The first and second phases of the cogeneration project of the heating center. In this phase, there are two 260t/h high temperature and high pressure circulating fluidized bed boilers + 130MW compressed turbogenerator and one 40MW compressed turbogenerator set. Primary fan, secondary fan, induced draft fan, return fan equipment, technical requirements for equipment functional design, structure, performance, installation and testing, etc.
And stipulate all technical requirements and applicable standards, provide a set of high-quality products and corresponding services that meet the requirements of technical specifications, and must meet the requirements for safety and security promulgated by China.
Fan: air volume 150,000~200,000m3/h; flue gas volume 250,000~580,000m3/h, flue gas temperature is designed according to 20~135°C, and the maximum does not exceed 200°C
Motor: 800KW 10KV; 1250KW 10KV