• China Office Hotline
    0086 533 5201284
  • Vietnam Hotline
    0084 086 9378260
  • Singapore Hotline
    0065 3163 2969
  • Free Consultancy
    info@decent-machinery.com

Knowledge! Polyurethane compound air duct

Posted on 2024-02-27


Product selection points

1. Polyurethane bubble plastic plate composite duct selection The main control parameters are combined, thermal conductivity, thermal insulation material density, plate thickness, and surface layer material, etc.
 
2. The ventilation and air regulating system's duct should adopt a rectangular cross section with a round or long and short -border ratio. Its maximum length and short -edge ratio should not exceed 10.
 
3. Polyurethane foam plastic plate composite ducts should be non -combustible materials.
 
4. The ventilation and air -regulating system's ducts should be used for non -combustible materials. Except for the following situations:
 
a) The duct and flexible joint of contacting the corrosive media can be used for difficult materials;
 
b) Gymnasis, exhibition halls, waiting (cars, ships) buildings (halls) and other large space buildings, office buildings and B, Ding, and Wuyan factories in high -rise civil buildings When the fireproof partition is set and a smoke -proof fire prevention valve is set, the burning material can be used with less toxicity and the level of smoke density level ≤25.
 
5. Should not transport corrosive media.
 
6. Manufacturers should provide air duct resistance coefficients in order to calculate resistance loss.



Construction and installation points

1. The installation of the air duct must comply with the following regulations:
 
a) The splicing of the composite panel blasting plate should be glued with a 45 ° angle or the "H" -shaped solid strip. The adhesive should be used for non -combustible materials. When the side length of the air duct ≤1600mm, it is advisable to adhere directly to the 45 ° corner slot mouth and paste the aluminum foil tape on both sides of the bonding seam; when the edge length> 1600mm, the "H" -shaped PVC or aluminum alloy reinforcement should be adopted. The strip is stitched at the 90 ° angle groove.
 
b) Other pipelines are strictly prohibited in the air duct;
 
2. Delivery air temperature is higher than 80 ° C. Protective measures shall be taken in accordance with the design regulations.
 
3. After the air duct system is installed, strict inspection should be performed in accordance with the system category. The amount of air leakage shall comply with the provisions of the GB50243-2002 "Code for the Construction Quality Acceptance of Ventilation and Air Conditioning Engineering Construction".



Execution standard

1. Product standard
 
Product Standards
 
JGJ141-2004 "Technical Regulations for ventilation pipelines"
 
GB8624 "Method of Burning Performance Materials"
 
2. Engineering standards
 
GB50016-2006 "Code for Fire Prevention of Architectural Design"
 
GB50046-95 "Fire Fire Standards for High-level Civil Architecture Design"
 
GB50019-2003
 
GB50243-2002 "Code for the Construction Quality Acceptance of ventilation and air-conditioning engineering construction"
Hot News
  • DECENT MACHINERY Deepens Overseas Mining Cooperation with High-standard Customized Fan Solutions 2026-09-09 DECENT MACHINERY Deepens Overseas Mining Cooperation with High-standard Customized Fan Solutions Upholding the philosophy of quality-oriented development and customer-centric service, DECENT MACHINERY continues to expand its global mining equipment market footprint. Recently, the company has achieved in-depth and repeated cooperation with a high-standard mining client in Southeast Asia, relying on reliable product quality, rigorous safety standards and transparent full-cycle service, further ...
  • DECENT MACHINERY Delivers Custom‑Built Tunnel Fans for Leading Underground Gold Mine Project in Cent... 2026-09-08 DECENT MACHINERY Delivers Custom‑Built Tunnel Fans for Leading Underground Gold Mine Project in Central Asia DECENT MACHINERY continues to deliver robust custom‑tailored tunnel ventilation solutions for a flagship underground gold mining operation across Central Asia, addressing extreme underground operational challenges within complex deep‑mine environments. The region’s premier underground gold mine has long grappled with persistent operational bottlenecks stemming from narrow underground drifts, kilom...
  • DECENT MACHINERY Deepens European Strategic Cooperation After 3 Years of Dedicated Communication 2026-09-07 DECENT MACHINERY Deepens European Strategic Cooperation After 3 Years of Dedicated Communication Recently, DECENT MACHINERY’s overseas business team held an in-depth face-to-face business meeting and friendly dinner negotiation with long-term European clients in Shanghai. Both parties reviewed the whole progress of project communication, confirmed the official cooperation order, and conducted in-depth discussions on future multi-dimensional strategic cooperation.   The project cooperation bet...
  • New Order Secured: Multistage Centrifugal Fans for a Key Southeast Asia Project 2026-09-04 New Order Secured: Multistage Centrifugal Fans for a Key Southeast Asia Project We are delighted to announce that Decent Machinery has won a new contract for multistage centrifugal fans. This equipment will be deployed in a major China‑aided landmark project in Southeast Asia.   The end customer is a global leading manufacturer of power semiconductors. The multistage centrifugal fans are designed for the factory’s wastewater treatment system, serving as core aeration equipmen...
Category
Get in Touch